The Awak Mas Gold Project Probable Reserve at 0.5 g/t Au cut‐off using a US$1250/oz gold price is 26.9 Mt at 1.32 g/t Au for 1.14M contained ounces (reported September 2018). The Ore Reserve estimate (Table 1) is based on the Mineral Resource estimate reported for the Awak Mas and Salu Bulo deposits in May 2018, and work completed in the first stage of the Definitive Feasibility Study (DFS).  

The DFS remains on track for delivery in September 2018. The focus of the DFS is now on value enhancement with attention to waste dump design, pit optimisation, materials handling efficiency, and mine scheduling

Awak Mas table.PNG